Show the specific prerequisite in the 'Prerequisites' column rather than the highest-level task
When a task (toptask) has several subtasks (sub1, sub2, etc.), and the subtasks must be executed in a specific order (e.g., sub1, then sub2, etc.), prerequisites can be set on the subtasks. However, the 'Prerequisites' column only shows the name of the highest-level parent task (toptask) rather than the name of the prerequisite subtasks (e.g. prerequisite sub1 for sub2).