304 results found
-
Task Coach on Iphone
Bonjour, Ce serait super de voir cette application sur Iphone
3 votes -
More flexible repeating task options
It would be great for me to be able to set a task to show up on my task list x amount of time after it is completed, rather than after it is starting. I have so many floating tasks that should get done about once a week. Another option would be to set a task to pop up at completion with a dialogue asking for the details of the next occurrence.
3 votesAnd this is really a duplicate of this:
http://taskcoach.uservoice.com/forums/26465-desktop-version-windows-linux-mac-of-task-coach/suggestions/289034-task-recurrence-based-on-the-date-of-completionAlthough there does exist a separate idea about recurrence based on amount of time with higher resolution than days… but I’m thinking about that, so it may happen at some point…
Thanks for your request. Please let us know if there is something you want that the latest version doesn’t do and no other request already covers.
-
set expiration date when task finish
if the task has not expiration date, when marks the task as complete not appear at the calendar view.
the program should set automaticaly (if not has) expiration date like the finish date.
other thing, the drag & drop into days at the calendar view, it's comented somewhere??
1 vote -
main task gets completed automatically when all subtasks are completed. should be configurable.
main task gets completed automatically when all subtasks are completed. should be configurable so that main tasks can be manually set to complete when desired.
0 votesThis is configurable. Check the preferences, task behavior tab.
-
Stop time in the effort window
Up to the TC version 1.0.10 (OS Windows) the stop time in effort windows was re-assigned to current time when the check box was re-checked.
Could you put this feature back on ?
Thanks !3 votesAvailable in release 1.2.26.
-
Add Task Behavior Preference for Start Date
Reason:
I'd like to add a "todo" to the list of tasks so I remember it, but not have it start until I actually start work on it.Current (ver 1.2.18) behavior is to set start date to now.
Request
1. Add option to Edit > Preferences > Task Behavior
Option to have a radio selection
... Set Start Date/Time to immediately (default option)
... Do not set Start Date/Time
Having the default set to set to immediately will preserve existing behavior by defaultWhen adding a new task/subtask, use task preferences to set start date/time
When adding effort to…
1 voteThere is now a preference for controlling this, everything here is doable!
-
Why does Task Coach not automatically save?
Why does Task Coach not automatically save?
1 voteIt does save automatically if you turn on the autosave preference :-)
-
Include css in exported html file for easy emailing
It would be nice with one-file html exports. In other words that the .css file would be included in the .html-file. It would be easier to mail html-formatted reports and so on..
1 voteAvailable in release 1.2.16.
-
New item in help menu: "Improve translation
2 new items in Help Menu: "Contribute to the translation"
Below the menu item "Request a feature" there should be implemented 2 new items:
(a) "Contribute to the translation - all languages"
with a link to https://translations.launchpad.net/taskcoach/1.2
(b) "Contribute to the translation - current language"
with a web-link to https://translations.launchpad.net/taskcoach/1.2/+pots/i18n.in/de/+translateThe link should automatically point to the translation page with the actually used version and in case (b) the actually used language.
3 votesRelease 1.2.15 has a “help translate” menu item. The second menu item is a bit tricky because Task Coach and Launchpad don’t always use the same abbreviation for languages. I.e. the current language in Task Coach may be nl_NL, but on Launchpad it would be just nl. Stripping the NL isn’t always possible, e.g. for ptBR. So, too much complexity for a simple menu item.
-
enable start tracking when task is inactive
if i finish a task before expiration date and mark as complete, i can't start tracking the next effort
2 votesThis is possible in the latest Task Coach release.
-
make it possible to start an effort for a task that has no start date
It would be great if I could start tracking an effort for a task that has no start date. Now, I have to open the task, set the start date, and then start tracking effort.
If a task has no start date, it should get Now() as startdate and time, when I press the "Start tracking effort" button.
6 votesAvailable in release 1.2.18.
-
1 vote
You can already do that. When printing, all columns shown in the viewer are printed, so just show the description column (right-click the header) before printing.
-
Get a Flattr button on your web site
In order to allow to make donations easier, why don't you get a flattr (www.flattr.com) button on your web site? That'll be one click and you'll be supported!
3 votesFlattr changed their policy so we can now have a Flattr button without being forced to donate a fixed amount each month ourselves.
-
Go to task being tracked
When there's a long list of tasks it may take a bit to go to task that's currently being tracked. It would be nice to have a button or shortcut thats select the task thats being tracked.
Thank's
1 voteRelease 1.2.18 allows you to edit the tracked task without first selecting it. See Action→Edit tracked task
-
Add a Now button to the Edit Effort Window
In the Edit Effort window, it would be nice if there were "Now" buttons next to the start and stop times so that you could click button and it would automatically update the time value in the respective start/stop field to be the current time.
This would often be useful such as when I start a new effort when I begin the effort and type notes as I go along. Then when finished, I could click the "Now" button next to stop time and click OK and be done.
[In other words, clicking the "Now" button next to the start…
3 votesWe have a new date/time control that is already functional in the latest bugfix release and will be in the upcoming 1.3.21 full release.
There is already a button for “stop tracking now” and with the update, you can just press the N key in any date/time field across the program and it will enter the current time!
-
New item in help menu: "Check for Updates"
Below the Help Menu item "About Task Coach..." there should be implemented another new item: "Check for Updates", ideally with an automatical function "Install new portable version" in the same directory "....".
3 votesAvailable in release 1.2.16.
-
Add capability to send a mail from within TaskCoach (I want to delegate a task)
Having the possibility to send a mail from TaskCoach would be great. The mail subject should correspond to the task subject. This feature would come in handy to delegate tasks or ask for the status of work done.
1 voteThis is already possible. Select a task and select the Actions→Mail menu item.
-
Let user customize toolbars
It would be great to customize toolbars. Every user could simplify the program interface to his needs. There are too many repetitive icons while working with several windows. A single main toolbar could play a big role in this idea. Thanks!
19 votesCustomizable toolbars are now included as of v. 1.3.21!
Some new toolbar buttons are now available and more will be added in the future.
Giving the toolbars customized or variable size icons is going to be a separate issue though.
-
allow an exported view of the tasks in pdf form for sharing
ability to export the tree view of the tasks for sharing with other people in a format like pdf, MS Word, or MS Excel
3 votesThere are already several options: export to CSV and import in Excel, export to HTML or print to a pdf-printer.
-
To view time spent and costs in main window on current choosed project
To view time spent and costs in main window on current choosed project
1 voteYou can see the time spent in the task viewer by making the time spent column visible. Cost is not possible since Task Coach doesn’t support the concept of cost at the moment.