Skip to content

Desktop version (Windows/Linux/Mac) of Task Coach

Welcome to the Task Coach feedback forum. This forum is for the desktop (Windows/Linux/Mac OS X) version of Task Coach. Please stick to basic operation of the program itself. Requests that require the implementation of technology outside of the main program go in the “Other feature request” section.

Desktop version (Windows/Linux/Mac) of Task Coach

Categories

JUMP TO ANOTHER FORUM

779 results found

  1. Have category templates as separate from task templates. Task templates can inherit category templates for proper classification.
    This would allow several time management methods such as GTD to be encoded as cateogy templates.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  2. i think it would be a nice feature that the exported html shows the decription of each subject with onmouse over command.
    Short hint: http://de.selfhtml.org/javascript/sprache/eventhandler.htm#onmouseover

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  3. I think that a network multiclient version would be very nice.

    Users should be able to see their own tasks alongside tasks that are shared among the group.

    A project manager could include a task for his team, assign to an employee and receive updates over the network.

    It would be great too the possibility to generate daily, weekly and monthly reports per project sort by team members.

    37 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  4. recurring tasks - add ability to mark recurring task as missed (not complete) but still due on the next regular date.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  5. If you are using taskcoach on an USBStick and different computers (workstation laptop at home ...) you will like it, to have the backup copy not on your USB-Stick.

    I lost the second time my xmlfile filesize 0bytes

    7 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  6. Show categories of a task in a reminder window just like in a "Categories" row in a main list.

    fast & easy to implement i think.

    15 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  7. Some tasks have fixed length independent of when they started. So if a prerequisite completes late, the deadline must automatically shift (think of getting a baby).
    Being able to enter task duration in working days would really improve the benefit of templates and other multistep activities.

    Short form:
    1. task duration in working days.
    2. shift due dates based on completion of prerequisites

    Thanks a lot!

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  8. 3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  9. I've had several situations where I needed to print a hierarchical chart of my task list. It's currently possible to print the task list organized by hierarchy, but having the possibility to print a hierarchy chart would be a killer feature for me. See:
    http://www.hit.ac.il/staff/leonidM/information-systems/images/64-01.jpg

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  10. I would like to see implemented a new Viewer that support a filter to show how many hours we work in each categories that we set for each task done, based on effort.

    I tried to look at the effort viewer, but I'll love to see a new viewer that do the job automatic for me.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  11. When the main window is showing, you can interact with it (I think) by clicking on the taskbar icon or the notification area icon. This seems redundant. It would be nice (in my opinion) to optionally allow the user (Preferences->Window Behavior) to prevent the taskbar icon from showing up at all.

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  12. It would be nice if the effort details view of the Effort Viewer would have an option to have lines separating each day.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  13. have the taskbar notification show the current task duration in the tooltip. This functionality is in Grindstone 2.1 and it helps me a great deal

    6 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  14. There are always tasks, that needs to be marked as "cancelled" - not completed, but not visible in ToDo.

    161 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  15. It would be very helpfull if files (attachements) can be saved within a Taskfile in XML as CDDATA.

    Drag & Drop would be a perfect addition to this function.

    Please don't mark it as "completed" again, cause it's not implemented. The relative path is not the same.

    46 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)

    We will leave this open, but please, everyone who wants files to just be moved or copied to a directory that could be paired with the .tsk file, move your vote to this:
    http://taskcoach.uservoice.com/forums/26465-desktop-version-windows-linux-mac-of-task-coach/suggestions/991699-allow-real-attachments

    This request here will be considered specifically a request for within the .tsk file itself. It is also unlikely that this request will be implemented. The other, which already has more votes, is more realistic.

  16. I have hundreds of tasks organized with different levels of subtasks. To make it easier to organize myself, I often have two different viewers of "Tasks" opened, normally one with a flat list of tasks, and the other with hierarchy.
    I would like to be able to drag tasks from one viewer to the other

    9 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  17. When you click on a task that has dependencies, it would be nice to be able to see at a glance in both the calendar and list view what those dependencies are.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  18. Please use relative PATH for *.tsk file. Because I use Please use TaskCoach from DropBox. When DropBox mount diffrent PATH with another,TaskCoach.exe try to find *.tsk file by absolute PATH then error.If relative PATH,it All ok. Thanks good software!

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  19. Add option to tracking mechanism to automatically stop tracking when time has passed configured working hour and restart tracking again on next morning when configured workinghour has passed. And an option to overrule above option for configurable time when working late.

    1 vote
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    0 comments  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  20. When resizing a task coach window with multiple viewers, some viewers stay the same size swallowing up other viewers while others scale with viewers in related positions. It would be nice to have two buttons on each viewer to control whether a viewer stays the same size, one for horizontal and one for vertical dimensions, or scales in relation to other viewers.

    3 votes
    Vote

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
    You have left! (?) (thinking…)
    1 comment  ·  Admin →
    How important is this to you?

    We're glad you're here

    Please sign in to leave feedback

    Signed in as (Sign out)
  • Don't see your idea?